• <tr id='8Ur1gQ'><strong id='8Ur1gQ'></strong><small id='8Ur1gQ'></small><button id='8Ur1gQ'></button><li id='8Ur1gQ'><noscript id='8Ur1gQ'><big id='8Ur1gQ'></big><dt id='8Ur1gQ'></dt></noscript></li></tr><ol id='8Ur1gQ'><option id='8Ur1gQ'><table id='8Ur1gQ'><blockquote id='8Ur1gQ'><tbody id='8Ur1gQ'></tbody></blockquote></table></option></ol><u id='8Ur1gQ'></u><kbd id='8Ur1gQ'><kbd id='8Ur1gQ'></kbd></kbd>

    <code id='8Ur1gQ'><strong id='8Ur1gQ'></strong></code>

    <fieldset id='8Ur1gQ'></fieldset>
          <span id='8Ur1gQ'></span>

              <ins id='8Ur1gQ'></ins>
              <acronym id='8Ur1gQ'><em id='8Ur1gQ'></em><td id='8Ur1gQ'><div id='8Ur1gQ'></div></td></acronym><address id='8Ur1gQ'><big id='8Ur1gQ'><big id='8Ur1gQ'></big><legend id='8Ur1gQ'></legend></big></address>

              <i id='8Ur1gQ'><div id='8Ur1gQ'><ins id='8Ur1gQ'></ins></div></i>
              <i id='8Ur1gQ'></i>
            1. <dl id='8Ur1gQ'></dl>
              1. <blockquote id='8Ur1gQ'><q id='8Ur1gQ'><noscript id='8Ur1gQ'></noscript><dt id='8Ur1gQ'></dt></q></blockquote><noframes id='8Ur1gQ'><i id='8Ur1gQ'></i>
                中央人民政府| 陜西省政府| 漢中市政府
                服務事項搜索
                2019 年 1-5 月重點建設項目進展情況通報
                來源:百姓五分快3政府門戶網站     作者:     點擊數:     發表時間:2019-06-22 10:03:01
                    

                第 18 期


                2019 年 1-5 月重點建設項目進展情況通報


                2019 年全縣共確定重點建設項目 82 個(104 個子項目,其中新建 69 個,續建 35 個) ,總投資 140.1 億元,年計劃完成投資 69.5 億元。 截至 5 月 31 日, 82 個縣級重點項目完成投資 23.1億元,占年度投資計劃的 33.3%,差均衡進度 8.4 個百分點。縣級重點項目中仍有 25 個子項目未開工,26 個子項目未達均衡進度,1 個項目停建。

                按照《關於縣級領導包抓 2019 年重點項目的通知》 (勉辦發〔2019〕11 號)文件要求,現對 1-5 月重點建設項目進展情況進行通報。請未達均衡進度、停建、未開工項目相關責任單位對項目存在問題進行分析解決,推進項目建設進度,特別是未開工項目責任單位要認真查擺問題,采取切實可行的措施,確保按期開工。